• 专利标题:   Method for arranging pre-embedded pipe of reinforced building concrete floor slab based on prolonged service life design scheme, involves arranging pre-embedded pipe in inner portion of reinforced concrete floor, and arranging wire or heating wire in pre-embedded pipe and connecting pipe.
  • 专利号:   CN114184100-A
  • 发明人:   PENG Q, XU Z, HUANG W, CHEN W, ZHANG H, YE J
  • 专利权人:   HUBEI CHANGAN CONSTR GROUP CO LTD, UNIV HUBEI TECHNOLOGY
  • 国际专利分类:   E04B005/48, E04G023/08, F42D001/00, F42D001/08, F42D003/02
  • 专利详细信息:   CN114184100-A 15 Mar 2022 F42D-001/00 202232 Chinese
  • 申请详细信息:   CN114184100-A CN11294994 03 Nov 2021
  • 优先权号:   CN11294994

▎ 摘  要

NOVELTY - The method involves arranging a pre-embedded pipe (3) in an inner portion of a reinforced concrete floor (2) during construction period of reinforced concrete floor. An end portion of the pre-embedded pipe is arranged with a connecting pipe (5.1). A wire or heating wire is arranged in pre-embedded pipe and the connecting pipe. An end portion of the connecting pipe is bent near a wall root (4) along upward direction. An empty groove is opened on the wall root. The empty groove is covered with a strip-shaped empty box (6). The empty box is fixed on the wall root through a bolt. USE - Method for arranging a pre-embedded pipe of a reinforced building concrete floor slab based on prolonged service life design scheme. ADVANTAGE - The embedded pipe is used as a heating pipeline or a decoration wiring pipeline in a service life cycle of a building and a blasting hole, so that ensures better green environmental protection, thus reducing full service life cost consumption. The method enables constructing the reinforced concrete floor slab, and realizing indoor warming and indoor routing in a service life cycle. The method enables avoiding blasting demolition defects after the service life cycle is completed so as to improve economic and social benefits. The method enables selecting insulating property, high temperature resistant polyethylene pipe or polypropylene (PP-R) pipe or graphene pipe and realizing building during the pre-embedded pipe arranged in the heating wire. The method enables indoor heating defects in winter. The method enables utilizing a domestic relatively advanced heating wire as a carbon fiber heating wire so as to quickly realizing heat transferring process with long service life cycle. The method enables realizing arrangement of the embedded pipe so as to reduce weight of the reinforced concrete floor in a certain degree and construction cost consumption. The method enables avoiding drilling operation when blasting, reducing working time consumption and dismounting cost consumption, and simplifying the blasting operation. DETAILED DESCRIPTION - An INDEPENDENT CLAIM is included for a method for disassembling and blasting a reinforced concrete floor slab pre-embedded pipe based on prolonged service life design scheme. DESCRIPTION OF DRAWING(S) - The drawing shows a front view of a structure for arranging pre-embedded pipe of a reinforced building concrete floor slab based on prolonged service life design scheme. Wall body (1) Reinforced concrete floor (2) Pre-embedded pipe (3) Wall root (4) Connecting pipe (5.1) Empty box (6)