▎ 摘 要
NOVELTY - Reconstructing antistatic floor involves opening the depth to the base concrete the hole or the groove on the failure or failure of the anti-static floor, coating conductive primer on the excavated hole wall or groove wall, filling the conductive spindle material into the hole, after completely curing the conductor material in the cavity, surface, testing the resistor system, when the resistor is greater than 106%, repeating steps, when the resistance is less than 106, coating the hyper-branched ceramic anti-static coating on the ground to be reconstructed, and finishing the reconstruction of the static-free terrace. USE - Antistatic floor reconstruction method. ADVANTAGE - The antistatic floor reconstruction method is fast, economic and effective, provides good operability for anti-static engineering reconstruction, ensures each use of function terrace, and meets the SED release.