• 专利标题:   Nuclear radiation-resistant vulcanized rubber, comprises Ethylene propylene rubber, radiation resistance auxiliary, filler, vulcanizing agent, accelerator, plasticizer, and antioxidant.
  • 专利号:   CN114262487-A
  • 发明人:   ZHAO C, LIN J
  • 专利权人:   HEBEI YUTONG SPECIAL RUBBER HOSE FACTORY
  • 国际专利分类:   C08K003/04, C08K003/22, C08K003/24, C08K003/38, C08K007/08, C08K007/14, C08L023/16, C08L061/06, C08L063/00
  • 专利详细信息:   CN114262487-A 01 Apr 2022 C08L-023/16 202252 Chinese
  • 申请详细信息:   CN114262487-A CN11637497 30 Dec 2021
  • 优先权号:   CN11637497

▎ 摘  要

NOVELTY - Nuclear radiation-resistant vulcanized rubber, comprises 80-90 pts. wt. Ethylene propylene rubberrubber, 30-50 pts. wt. radiation resistance auxiliary, 40-60 pts. wt. filler, 3-8 pts. wt. vulcanizing agent, 1.5-3 pts. wt. accelerator, 10-20 pts. wt. plasticizer, and 2-5 pts. wt. antioxidant, where the radiation resistance auxiliary includes lead oxide, bismuth oxide, barium sulfate and/or antimony trioxide. USE - Used as nuclear radiation-resistant vulcanized rubber. ADVANTAGE - The rubber has stable protection and shielding performance for nuclear radiation, has excellent comprehensive physical performance, stable performance and reliable safety. DETAILED DESCRIPTION - An INDEPENDENT CLAIM is also included for preparing the nuclear radiation-resistant vulcanized rubber, comprising (1) in the rubber mixer, adding ethylene propylene rubber, and pressing the raw rubber for 1-2 minutes, adding fillers and plasticizers and mixing for 3-5 minutes, adding antioxidants, radiation resistance additives, and reinforcing components, mixing for 2-3 minutes, and mixing at a temperature of 120-150degrees Celsius for 6-10 minutes, discharging the glue and the film is left, and allowing to stand for 12-24 hours, (2) fully mixing the mixed rubber and filtering in a rubber filter, and (3) pressing the filtered mixed rubber together, and controlling by adding sulfur in a rubber mill, adding vulcanizing agent and accelerator, and mixing the rubber for 1-2 minutes, adjusting the roller distance to 2-4 mm, thin the pass for 3-5 times, punching 6-8 triangle bags, pressing for 3-5 minutes, where the glue removal temperature is less than or equal to 120degrees Celsius, cooling and storing.